From bare concrete to a finished, sealed, performance-ready floor — every system below is installed in-house with the prep, primers, topcoats, and finish layers spec'd for the environment.
Purpose-built coating systems for school cafeterias, gymnasiums, hallways, common areas, locker rooms, and restrooms. Slip-resistant, sanitary, and chemical-rated to handle thousands of students a day. Installed on summer breaks, weekends, and shutdown windows so the district hits the bell.
Long-lasting resinous flooring built for K-12 schools, warehouses, manufacturing plants, commercial kitchens, and high-traffic facilities. Multi-coat builds engineered for impact, abrasion, and decades of service.
Aesthetic, slip-resistant finishes for school hallways, locker rooms, restrooms, showrooms, retail, healthcare, and food service. Texture and color matched to brand and code.
Diamond grinding, shot blasting, and full coating removal. The prep is what makes the system bond — we don't shortcut it.
Stop the slab from sweating out the coating. Required spec for any below-grade install or slab with elevated MVT readings.
Built for plants, labs, processing facilities, and wash-down environments. Resists acids, solvents, oils, and aggressive cleaning protocols.
OSHA-friendly aggregate broadcasts and textured finishes for school cafeterias, gymnasiums, locker rooms, kitchens, ramps, and any area where wet-floor traction matters.
Integral cove bases that eliminate seams and meet sanitary code for school cafeterias, food, healthcare, and pharmaceutical facilities.
UV-stable systems engineered for the Florida sun. Decorative, durable, and built to handle salt, sun, and constant traffic.
Existing system delaminating, peeling, or just past its life? We diagnose the failure point and install the right rebuild — not a band-aid.
We come on site, inspect the slab, identify the use case, and spec the right system for your environment — not the system that's easiest to sell.
Diamond grinding or shot blasting to the correct CSP profile. Crack repair, joint detailing, moisture testing — the work nobody sees that determines if the floor lasts.
Primer, body coat, broadcast layer, topcoat — installed to manufacturer spec with documented mil thickness and cure times. You get the facility back ready to work.
Send us the square footage and a few photos — we'll get you numbers within 24 hours.